BND1
BND1: Maintain dry stone walls
£27.00
info Summary
This action requires you to maintain eligible dry stone walls in good condition. This involves visually checking their condition at least once a year, carrying out any necessary repairs, and keeping a record of the checks and repairs.
format_list_bulleted What to do
Maintain dry stone walls in good condition by visually checking them annually, carrying out necessary repairs with appropriate materials, and keeping a written or photographic record of all repair work.
schedule When to do
You must check the walls at least once a year and complete any necessary repairs within 12 months of identifying the need.
checklist How to do
The method is flexible, as long as the mandatory requirements are followed and the action's aim is achieved.
description Evidence Required
You must keep the required written or photographic record and supply this evidence if we ask for it.
tips_and_updates Additional Advice
Advice is provided on measuring walls, identifying repair needs (e.g., fallen stones, slumping), and best practices for repairs, such as checking for nesting birds before starting work and using appropriate stone.
View Official Guidelines
Access detailed information about this action on the RPA website
SFI 2026 Announcement
Read details about SFI 2026 changes, definitions, and what to expect on the Defra farming blog